I got a call at work this afternoon from the lady at Home Depot in Georgia who had called me last week about my installation. She said that she had spoken with the district services manager (DSM) and that the DSM had called me and left a message today (he left a message on the home phone).
I'll cut to the chase. The DSM said that the general contractor's permit had to be re-sent to the City last Thursday, as it had been kicked back to the GC due to "fire approval." (I'll find out what that means when he calls me back in a day or two.) He said it looks like they would be able to begin the electrical work with permit in hand next Wednesday or Thursday, but maybe sooner (he mentioned end of this week).
1 comment:
If you are doing a pool, I'll put my bet on the day before Thanksgiving.
I really do feel your pain with this kitchen redo.
Post a Comment